Maintenance & Upgrades

2021 Maintenance & Upgrades

Cleaning Freshwater tank June 2021 & Oct 2022

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

Soon after arriving in Rhoon on July 11, 2021, we contacted reconditioning company ACI specialized in fire and smoke clean-ups. As they make up their quotation they soon notice that the use of powder extinguishers requires a complete cleaning of the interior and electronic equipment. This will rocket the costs! We contact the insurance company Panteanius. They appoint an inspector but fully understand the situation and are very cooperative. The Dutch surveyor appointed by them is also very understanding and reasonable. Finally, the entire interior of the ship is cleaned from top to bottom. All upholstery and a large number of sails that were in the vicinity of the fire are taken to a professional for cleaning and coating. All electrical equipment is removed and taken for washing and drying by specialist AREPA. Very professional. Everything is labeled for proper re-insertion. One by one, all compartments and storage spaces are emptied and cleaned and everything is put back in its place. Getting everything off the boat for cleaning is impossible. We would never know where it came from. It takes a total of 3 weeks, but the ship is spick and span again. We can replace part of the upholstery and mattresses at the expense of the insurance. We decide to replace everything right away. We actually wanted to do that somewhere in the Caribbean much later, but we cannot pass up this opportunity. In the end, this will take quite a few months, but in December 2021 all upholstery and mattresses are replaced. It looks great. The air conditioning in the back cabin will also be replaced in its entirety. We can only say that it was handled very neatly by Pantaenius Hamburg. And not to forget. All powder extinguishers have been thrown overboard and replaced by foam extinguishers, and of course a smoke detector has been installed in every room. We get to know the ship better and better and get to work to carry out maintenance and adapt the ship to our wishes.

July 2021 Reconditioning of the interior  after the airco incident

Juni/July 2021 New Gauge and flowmeter Ecotec Watermaker & Dolfinseat revarnished

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

July 2021 Stove extensively cleaned and gas hoses, fire-extinguishers replaced . 

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

August 2021 Refrigerator door and freezer compartment hatch replaced, new car radios in saloon and aft cabin

August 2021 Spare anchors sandblasted and powder coated, Replaced leader head cushion above companionway

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

September 2021 New silk lampshades and polish ambiance lights 

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

September 2021 RVS hatch dogs on all deck lockers

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

September 2021 RVS  skepter for outboard , bullwork protector and cockpit bar made 

September 2021  All sails professional washed and recoated

October 2021  Saloon windows refurbished with 3M Vinyl Film

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

October 2021  New flyscreens hatches 

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

November 2021  New hatch covers 

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

November 2021  Raw water pump and coupling Volvo replaced. Spare refurbished. 

November 2021 New Upholstery 

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

December 2021 New Aircondition unit Aft cabin

December 2021 Renew Onan raw water pump. Renew Racor fuel filter bolts on Onan

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

December 2021 New cockpit cushions

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

2022 Maintenance & Upgrades

Januari 2022 All winches cleaned & greased and equipped with covers

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

February 2022 Installed an outdoor hot & cold shower in the cockpit with extra deckwash pump

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

April 2022 New Q-sail Genua  & Pressure test Suba diver bottles & full maintenance scuba gear

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

July 2022 Complete electrical system updated 

The electrical system is the heart of the ship and extents the time of freedom being off grid. The outdated Amel system needs an upgrade. We eventually want to go to Lithium (LiFePo4) batteries because the current gel batteries lost their capacity. Currently off grid we have to run the generator 2x 1.5 hours every day. Secondly we prefer to reduce the number of hours of the generator, have it run shorter periods and at full power. The Amel system actually appears to have no fuses at all on large consumers such as the bow thruster (485 A). Only the end users have 16 and 10 A automatic fuses. So it is decided to overhaul and upgrade the entire system. Based on Lithium (Lifepo4) we also like the possibility of an induction stove. As a result the current 1500 W inverter is changed to a Victron Quattro II of 5000 W. All in all quite a large modification of the current system for which we need professional help. We found Arnold de Maa of ICT Nautic willing to make a proposal and execute the larger technical part of the installation. With help of our friend Joris we install all the wiring and the new solar panels ourselves. The first wire scheme is made in January 2022. Before the summer holidays, the vast majority of the system gets installed except for the new batteries. This way we are able to test the system and find any teething problems. Already we notice a huge improvement. We can use the consumers much freer without worry due to the larger inverter and extra solar with less generator hours per day. After the summer holidays, the new sets LiFePo4 batteries are delivered by PureAcell on 25 August 2022. Two sets of 8 cells each or 7.5 kWh/ 280ah. Total so 15kW/560 AH by 24 V. These are installed end of August, together with the remaining parts. Everything just ready for our yearly sail trip with the Tempo34 group. This time to London. The improvement with the LiFePo4 is enormous. No fear for crew using multiple electrical devices at the same time. We do however discover that the Eve Lithium cells supplied are not the A cells that were ordered. Cell 2 of the SB battery and cell 7 of the BB battery are not ok. A small set-back but Puracell immediately confirms that both sets will be replaced. For the time being, the current sets are good enough to complete this season. An advantage is that we will start our circumnavigation in 2023 with fresh set of A quality batteries. Ultimately, the new sets are delivered by Puracell in March 2023. The last adjustments and fine tuning are made by ICT Nautic and the conversion of the electricity is complete in May 2023 before the start of our circumnavigation.

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

Inverter Victron quattro II 5000 W, solar panels 1000 W, new PC board wind generator,

Gerbo Gx, GX touch screen, shunts, VE Bus BMS , main fuse board, 2x MPPT 150/60, main switches, External Sterling alternator regulator, 3x Victron inverters 12-24 VDC

July 2022 New full cockpit enclosure with raised front completed

One of our priorities is a new (raised) fully closed cockpit enclosure. After a number of quotations we chose “Zeilmakerij Stellendam”. There is a considerable delivery time but on April 20, 2022 Jan Snip started to make the molds. Except for some minor adjustments the new cockpit enclosure is completed and installed on 16th July, 2022. Just in time for our summer holidays also the last details are completed on 28th of July. It was worth waiting. A super nice cockpit enclosure and with a the desired extra height in the front end. Quite an satisfying improvement.

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

July 2022 New Transparent companion way hatches and added induction stove (1500&2000W) 

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

September 2022 New navigation seat and gas spring

October 2022 The 2022/2023 winter overhaul, maintenance  and refit commences

This winter 2022/2023 we are on for a major overhaul of the underwater. The hull appeared to contain osmose and we prefer to treat it in the earliest stage possible and be done with it for the rest of her life. In the mean time we do many other maintenance and preparations . The list is long but little by little we get them all done. A summary can be found in the photos below. At the same time we are cleaning up the house. and sorting, selling and bringing to the second hand shop. By March 2023 we have the house ready to be rented out as soon as we can live on Abayomi. And not to forget we start setting up our website and You tube channel.

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

October 2022 Clean, polish  and wax hull above waterline 

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

October 2022 Clean anchor locker and mark lengths on anchor chain

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

December 2022 Overhaul HP pump watermaker 

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

2023 Maintenance & Upgrades

January 2023 Renew top cover genoa furler profile and forestay

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

January 2023 Sandblast and repaint spreaders both masts

January 2023 Replace seals & wear bushing propellor axle, polish prop, replace c-drive oil

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

January/April 2023 Replace bowtruster seals and oil. Bowtruster recoated

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

New LiFePo4 circuit board for Wind generator

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

Nov 2022 -April 2023 Osmose treatment & sand and recolour water line

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

March 2023 install the new LiFePo4 batteries

photos to follow

March 2023 replace VHF antennes & coaxcables, Install radar reflextor

photos to follow

February- April 2023 Clean  & Polish Masts , install newly painted spreaders, radar dome

photos to follow

May 2023 regrease furler gear boxes

photos to follow